New Camp Pool

 

The new pool has replaced the original which had served the camp since 1961. This project has had an immediate impact on our camping program as the new pool doubles the size of the original.  This provides our campers a better and safer swimming experience.  The new pool was built in honor of David Ward, Camp Director 1995-2005. The total cost of the new pool was $226,000 and fundraising has now been completed!